How to speed up a print shop's order calculation 450 times with mathematical models

Fully automating the process engineer's job multiplied the speed and accuracy of business processes and created a lead over competitors

How to speed up a print shop's order calculation 450 times with mathematical models
Fully automating the process engineer's job multiplied the speed and accuracy of business processes and created a lead over competitors
Goals

  • Reduce the percentage of customers who drop out at the stage of calculating the order cost.
  • Speed up the calculation of order cost and production time.
  • Raise the accuracy of the order cost calculation to 100%.

The reason

90% of requests “burn out”: the customer submitted a request, but 9 out of 10 customers end up ordering from competitors.

The client's particularity is that it is not a quick-print shop where prices are calculated by a fixed formula but a real print shop, where the cost depends on the layout and cutting options, technological waste, machine hours, the cost of making accompanying materials and so on. This greatly complicates the process of calculating the cost of an order and takes a long time.
How to speed up a print shop's order calculation 450 times with mathematical models
Over 8 months of business and systems analysis we became experts in print production:

  • We studied the print shop's production process and all its technological operations thoroughly and reproduced that process exactly in our calculation core.
  • We analyzed in detail each product, the materials and equipment used to make it, worked out how the cost price is calculated, which sequences of operations are possible and so on.
How to speed up a print shop's order calculation 450 times with mathematical models
Then, in 4 months, we developed a configurator that calculates the cost of an order in 200 milliseconds with 100% accuracy without involving a process engineer.

Technical details: mathematical models
How to speed up a print shop's order calculation 450 times with mathematical models
Take the calculation of the simplest flyer: Unlike quick printing, a real print shop has 250 ways to print a flyer. Some are several times faster than in quick printing but several times more expensive; others are several times slower than in quick printing but several times cheaper.

The total number of operations needed to calculate a flyer exactly runs to several hundred thousand, and after a large number of calculations there are still too many options left for the customer to choose from.

To solve this problem, we used mathematical modeling by the Monte Carlo method, namely the “simulated annealing algorithm”. This mechanism sped up the calculation of an order many times over and increased business efficiency.

The process of creation
How to speed up a print shop's order calculation 450 times with mathematical models
We took apart the print shop's technological processes layer by layer. We planned to finish in 3 months, but in fact the analysis took 8. We got down to how the light bulb in the workshop above an employee's workstation affects the cost price of printing both one flyer and a run of 100,000 books.

But it was worth it: we modeled and digitized the client's production processes and built a tool that raised conversion to order 6 times and made the order itself convenient for the customer.
The result:

  • Order cost calculation was sped up 450 times: in 30 seconds the customer assembles the product combination they need and gets a price instead of waiting several hours for a calculation from a process engineer.
  • The print shop's process engineers stopped spending time calculating orders for customers.
  • The print shop's managers raised conversion to order 6 times.
  • Production load and revenue are many times higher.